We use general export packing or customized packaging according to your specific requirements to ensure safe transit.
2. How long is the typical delivery time?
It depends on stock availability. If the machine is in stock, it generally takes 3-5 days. If not, production usually takes 15-20 days.
3. What information should I provide to get a detailed quote?
Please provide the workpiece material, maximum and minimum dimensions (length, width, height), weight of the maximum workpiece, and your required daily or monthly cleaning capacity.
4. Is the DTW-0618 machine suitable for the electronic industry?
Yes, this model is specifically designed for applications in the electronic industry and for cleaning building climbing frames.
5. Does the equipment come with professional shipping support?
Yes, we work with professional goods shipping forwarders to handle the logistics of your machinery.
6. What control system does the machine use?
The machine is equipped with a high-quality Siemens PLC and an intuitive touch screen control system for automatic operation.